Avv. Renato Giuseppe Fiorentino, Avvocato cassazionista – office in Fasano, Valle d’Itria – Puglia, Italy (Via Monopoli 8)
Why do you need a written contract?
Many jobs start with a one-page quote or a handshake. When something goes wrong, there is no proof of what was promised, at what price and by when.
Trulli add their own risks: dry-stone walls, stone cones and traditional roofs need specific skills, and landscape protection under the Puglia regional landscape plan (PPTR) can dictate materials and shapes.
What should the contract include?
- Drawings and specifications (capitolato) attached, with materials and finishes
- Price, fixed or by measure, with each item listed
- Timetable: start date, duration and completion date
- Penalty for each day or week of delay
- Stage payments, with a share held back until final inspection
- Changes allowed only in writing, priced in advance
- Permits: who applies and who is responsible
- Insurance and compliance documents of the builder
How do you handle changes during the works?
Changes are where the price grows. Every change should be written, signed by both sides and priced before the work is done. Without this, the final bill is hard to dispute.
What if the works are late or defective?
Document everything at once: dated photos, site manager reports, written messages to the builder. Report defects in writing as soon as you find them, because Italian law sets short time limits for doing so.
Before stopping payments or changing builder, take advice: a wrong move can shift responsibility onto you as the client.
| Problem | First evidence | Next step |
|---|---|---|
| Delay | Signed schedule and site photos | Formal written notice and penalty |
| Unagreed extra work | Contract and specifications | Written dispute before paying |
| Defects or leaks | Photos, surveyor’s report | Written defect notice to the builder |
| Builder leaves the site | Record of work done | Consider ending the contract |
What should you check before signing?
- Company registration and social security compliance of the builder
- Builder’s insurance policies
- Drawings, specifications and bill of quantities attached
- Building and landscape permits already granted
- Appointment of an independent site manager (direttore dei lavori)
- Clauses on penalties, changes and final retention
What do owners often ask?
I live abroad: how do I follow the works?
Through a site manager you trust, regular reports, photos and remote calls. Tie each payment to their reports.
Is a signed quote a contract?
It can be binding, but it is usually too vague. A full contract with attachments is safer.
Can I hold back part of the price?
If the contract says so, yes: a share is paid after final inspection.
Related: Buying a trullo, masseria or villa in Valle d’Itria: what to check
General information, not legal advice or a promise of results.
Come può seguirti l’avv. Fiorentino
Lo studio assiste privati e imprese a Napoli, Roma e Bari, e a distanza in tutta Italia. Prima dell’incarico ricevi un preventivo scritto (art. 13 L. 247/2012).
Richiedi una consulenza online
WhatsApp 347 5264190 · Chiama 347 5264190 · Scrivi all’avvocato
Sedi su appuntamento: Napoli, P.zza Giovanni Bovio 22 · Napoli, Via Monte di Dio 14 · Roma, Viale Giorgio Ribotta 21 · Bari, Via Domenico Morea 38 · P.IVA 06116130722